Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of construction of approx 4618 LF of new fusion bonded 20" dips HDPE dr13. 5 force main and fittings. Construction of approx 282 LF of new 30" steel casing and installation of carrier pipe for crossing Euclid Avenue using guided horizontal auger bore and jack construction, including a jacking shaft, receiving shaft, shoring, and instrumentation. Construction of a new 72" "doghouse" style discharge junction manhole. Construction of a 13' x 13' x 13. 25' new precast concrete valve vault, with valves, piping, fittings, sump pump, grating, and electrical and instrumentation. Construction of two 18" motorized plug valves with 480v electric actuators connected to the existing MCC but requiring new buckets and breakers. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Oct 31, 2025
Close: Feb 17, 2026
SE force main improvements
AvailableProject to include constructing approx. 16,000 LF of 8" PVC, force main and appurtenances.
Posted Date
Dec 25, 2025
Due Date
Jan 22, 2026
Release: Dec 25, 2025
Close: Jan 22, 2026
Project to include constructing approx. 16,000 LF of 8" PVC, force main and appurtenances.
AvailableWork includes approx 4,250 LF of 8" sewer force main.
Posted Date
Jan 3, 2026
Due Date
Feb 11, 2026
Release: Jan 3, 2026
Close: Feb 11, 2026
Work includes approx 4,250 LF of 8" sewer force main.
AvailableThe project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.
Posted Date
Nov 19, 2025
Due Date
Jan 21, 2026
Release: Nov 19, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project consists of the cleaning, closed circuit television video (CCTV) inspection, and rehabilitation of a force main at the owner's jones island water reclamation facility (JIWRF). the force main carries flow from the head tank at the inline pump station (IPS) to either preliminary treatment or directly to disinfection and consists of approx. 801 LF of 72" reinforced concrete pressure pipe (RCPP), 177 LF of 72/78" steel pipe, a 72-" butterfly valve, and 222 LF of 78" rcpp for a total length of approx. 1,200 LF. Before rehabilitation work can be conducted, the force main needs to be cleaned and undergo a CCTV inspection. The RCPP segments require spot repair at a total of five locations. These spot repairs require surface preparation, abrasive or centrifugal wheel blasting, repair using repair mortar, and recoating with a high-build epoxy-based liner. The steel pipe segment and butterfly valve are to be cleaned and prepared for coating, in their entirety, with abrasive or centrifugal wheel blasting and recoated with a high-build epoxy-based liner. The contractor will supply all equipment and major power needed for the work.