Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Yonkers is soliciting bids for IFB-7451 Crisfield Pump Station Improvements to perform upgrades to pumping, piping, electrical components and associated site/building work at the Crisfield Pump Station (699 Scarsdale Rd., Yonkers, NY). The solicitation was published in early December 2025 with questions/pre-bid activity in mid-December and a bid opening scheduled for 2:00 PM local time on January 9, 2026. Solicitation documents (plans/specs/addenda) are hosted on the City’s BidNet Direct vendor portal and require registration/login to access; this is not a grant.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes furnishing all labor, materials, equipment, and supervision to complete the crisfield pump station improvements, consisting of architectural and finish renovations including removal and replacement of joint sealants at interior and exterior joints; furnishing and installing new galvanized metal doors and frames with insulation where specified; installing new aluminum windows with low-e insulated glazing and screens; providing complete door hardware packages including locks, closers, keying system, weatherstripping, and fire-rated components as required; and performing surface preparation and painting/coating of doors, frames, existing walls, exposed piping, and select equipment, including labeling and touch-up of factory finishes, to deliver a fully functional, code-compliant, and weather-tight facility.
Posted Date
Dec 3, 2025
Due Date
Jan 9, 2026
Release: Dec 3, 2025
Close: Jan 9, 2026
Work includes furnishing all labor, materials, equipment, and supervision to complete the crisfield pump station improvements, consisting of architectural and finish renovations including removal and replacement of joint sealants at interior and exterior joints; furnishing and installing new galvanized metal doors and frames with insulation where specified; installing new aluminum windows with low-e insulated glazing and screens; providing complete door hardware packages including locks, closers, keying system, weatherstripping, and fire-rated components as required; and performing surface preparation and painting/coating of doors, frames, existing walls, exposed piping, and select equipment, including labeling and touch-up of factory finishes, to deliver a fully functional, code-compliant, and weather-tight facility.
AvailableIncrease the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
Posted Date
Dec 15, 2025
Due Date
Jan 15, 2026
Release: Dec 15, 2025
Close: Jan 15, 2026
Increase the hydraulic throughput of the pump station. Complete the design of improvements to increase the hydraulic throughput to a firm capacity of 10,000 GPM (5 x 2,500 GPM) based on n+1 redundancy.
AvailableProcurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
Posted Date
Nov 23, 2025
Due Date
Jan 6, 2026
Release: Nov 23, 2025
Close: Jan 6, 2026
Procurement of services for the Fourche Creek WRF Primary Sludge Pump Station Improvements, including replacement of sludge pumps, piping, a ceiling-mounted crane, an access door, and electrical gear.
AvailableSealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Sealed proposals are requested for the Main Street Pump Station Improvements project to upgrade the City of Lewiston’s pump station systems, including demolition, a new emergency generator, electrical/HVAC/plumbing upgrades, fall protection, and site restoration. The contract requires completion by December 21, 2026 and the solicitation lists a response deadline of January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis