Work consists of signal modification.
Description: The Project consists of but not limited to approx. 2 EA Removal of Tree; 6 SY Removal of Concrete Median Cover Material (Splash Block); 59 SY Removal of Median Cover (Landscape Rock); 88 SY Removal of Sidewalk; 133 LF Removal of Curb and Gutter; 18 SY Removal of Asphalt Mat; 260 SF Removal of Pavement Marking; 1 EA Removal of Ground Sign; 3 EA Removal of Rectangular Rapid Flashing Beacon (RRFB); 2 EA Removal of Sign Post; 3 EA Removal of Sign Panel; 3 CY Embankment Material (Complete in Place); 115 LF Silt Fence; 24 LF Aggregate Bag; 20 LF Storm Drain Inlet Protection (Type 1); 2 EA Reset Sign Panel (by RTD); 185 SF Seeding (Native); 244 SF Rock Mulch (Match Existing); 18 SY Hot Mix Asphalt (Patching) (Asphalt); 10 LF Drilled Shaft (24 Inch); 38 LF Drilled Shaft (36 Inch); 73 SY Concrete Sidewalk (6 Inch); 56 SY Concrete Curb Ramp; 50 LF Curb Type 2 (Section B) (Special); 24 LF Curb and Gutter Type 2 (Section I-B); 117 LF Curb and Gutter Type 2 (Section II-B); 129 SF Median Cover Material (Splash Block); 58 LF 2 Inch Electrical Conduit; 97 LF 2 Inch Electrical Conduit (Bored); 116 LF 3 Inch Electrical Conduit; 194 LF 3 Inch Electrical Conduit (Bored); 4 EA Type Three Pull Box; 2 EA Luminaire (LED); 1 EA Meter Power Pedestal; 92 SF Sign Panel (Class I); 60 LF Steel Sign Post (2X2 Inch Tubing); 4 EA Signal Head Backplates; 4 EA Pedestrian Signal Face (16); 8 EA Traffic Signal Face (12-12-12); 1 EA Traffic Signal Controller Cabinet; 4 EA Pedestrian Push Button; 2 EA Traffic Signal - Light Pole Steel (1-30' Mast Arm); 2 EA Traffic Signal Pedestal Pole Steel; 1 EA Traffic Signal Controller (Q-Free); 30 LF Irrigation Sleeving (4" PVC); 362 SF Thermoplastic Pavement Marking.
City · CO, US
Adjacent opportunities open for bidding right now.
CityCA
Posted
Oct 12, 2026
Nov 17, 2026
Work consists of signal modification.
CountyFL
Posted
Oct 30, 2026
Dec 9, 2026
Construction of a new traffic signal at Cow Pen Rd. and Miami Lakes Dr., including decorative lighting, pedestrian features, roadway improvements, and pavement markings.
CityFL
Posted
Oct 18, 2026
Nov 19, 2026
Work includes 16,909 LF sediment barrier; 119 EA inlet protection system; 20 CY flowable fill; 7 EA modify existing drainage structure; 12 EA inlets, dt type c,<10' bot; 41 EA inlets, curb, type p-5, <10'; 6 EA inlets, curb, type p-5, partial; 13 EA inlets, curb, type p-6, <10'; 5 EA inlets, curb, type j-5, <10'; 1,479 LF pipe culvert,optional material,round, 15"s/cd. See attached file.
Special DistrictTN
Posted
Oct 27, 2026
Nov 10, 2026
Overhead electric line tree pruning and clearing vegetation management project
Decision makers connected to this RFP from City of Lafayette.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
359 days before RFP
The proposed 2026 transportation work includes prerequisite utility repairs, conduit and other improvements supporting a HAWK signal at Gold Hill, with resurfacing potentially following in early summer 2026.
The proposed 2026 transportation budget focuses primarily on integrating safety and multimodal improvements into areas where existing assets are in urgent need of replacement or substantial rehabilitation. Once the budget is approved, staff will move forward with preliminary designs, cost estimates, and scoping of prerequisite work such as utility repairs,…
City Council Notice Of City Council Meeting
Board meeting · Oct 28, 2025
Board meeting
324 days before RFP
The December 2 agenda memo proposed a $500,000 Kimley-Horn design contract for the Baseline Road near Gold Hill Drive HAWK crossing, with construction bids to follow.
City Council Agenda Memo Contract / Kimley-Horn and Associates, Inc. / On-Call Engineering Services Contract December 2, 2025 Prepared by: • Kady Doelling, City Manager • Jeff Arthur, Public Works Director • Casey Carlson, Senior Civil Engineer Executive Summary Council is requested to approve a contract for on-call engineering services with Kimley-Horn and…
Strategic plan
250 days before RFP
Lafayette's 2026 work plan planned construction of Baseline and Gold Hill pedestrian improvements.
2026 Construction Highlights • Annual Pavement Rehabilitation/Replacement • Baseline Road -- 96th Street to Caria Drive • Casper Drive • Exempla Circle • Annual Sidewalk Program • ADA Compliance • Safety Issues • Missing Links • Baseline & Gold Hill Pedestrian Improvements
City of Lafayette Work Plan 2026-2027
Strategic plan · Feb 14, 2026
Board meeting
184 days before RFP
The 2026 budget request detail lists $500,000 for Public Works Baseline & Gold Hill Traffic Signal Design and Construction.
The 2025 carryforwards and new 2026 supplemental requests are delineated in Attachment B. All items listed in the "Carryforward" column in Attachment B were previously approved by Council during the 2025 budget process. New requests are listed in the "Supplemental" column with supporting revenue noted alongside. A list of notable requests
City Council City Council Meeting
Board meeting · Apr 21, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (11 days left)
City Council Notice Of City Council Meeting
Board meeting · Dec 2, 2025