Indiana Department of Transportation
State AgencyIN
Aug 5, 2026
Closes
Sep 2, 2026
B-42374-A - I-69 Bridge Replacement
Work consists of construction engineering 1 LS; pavement removal, 494 SY; present structure, remove, structure no., 1 LS; fence right-of-way, remove, 130 LF; excavation, common 733 CY; stormwater management budget, 23998 DOL; excavation, foundation, unclassified, 1015 CY; subgrade treatment, type II, 132 SY; subgrade treatment, type IC, 3168 SY; aggregate for end bent backfill, 58 CY; milling, asphalt, 1 1/2-IN, 484 SY;gGuardrail connector system, w-beam, curved, type 2, 1 EA; guardrail, remove, 2196 LF; fence, farm field, 47-IN, 155 LF; paved side ditch, type A, 132 LF; erosion control blanket, 1384 SY; mulched seeding, type R, 1384 SY. See outside link.