Alabama Department of Transportation
Special DistrictAL
Posted
Oct 9, 2026
Nov 6, 2026
Bridge Deck Rehabilitation (Hydroblasting) RFP
Work includes removal of old bridge, partial, station, steel reinforcement for bridge superstructure, approx 3,090 pounds, steel reinforcement for bridge superstructure, approx 3,090 pounds, bridge substructure concrete, bridge concrete superstructure, station 367+51. 31, approx 4.5 CY, bridge concrete superstructure, station 368+32.24, approx 4.5 CY, 24 EA elastomeric bearing type 4, raising portion of existing bridge, 5,828 SY hydroblasting, 46 SY bridge deck repair with formwork, 1,698 LF solid temporary traffic stripe, 2,596 LF solid temporary traffic stripe, 849 LF broken temporary traffic stripe. See attached file.
