Montclair Board of Education
Installation of new HVAC systems including: 1. Heat, ventilation, air conditioning, exhaust, ductwork and piping. 2. New equipment includes, but it not limited to Classroom Unit Ventilators, Air Handlers, Packaged Heating and Cooling Systems, and Split Systems. 3. Replacement of two (2) existing boilers, associated pumps and other components with a new multi boiler plant. 4. The removal and replacement of the existing main building electrical switch gear.
Release
Jan 09, 2025
Close
Feb 06, 2025