Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide HVAC replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
High school gymnasium renovation.
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
High school gymnasium renovation.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be performed shall consist of furnishing all labor, materials, tools, and equipment necessary to complete the removal of the existing resilient gymnasium wood flooring and the installation of new wood flooring to match the existing system. Work includes surface preparation, sanding, and finishing of the new floor; application of all required game lines, striping, lettering, and the school logo in accordance with school standards; and final sealing, waxing, and buffing of the completed gymnasium floor to ensure a uniform, durable finish.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
The work to be performed shall consist of furnishing all labor, materials, tools, and equipment necessary to complete the removal of the existing resilient gymnasium wood flooring and the installation of new wood flooring to match the existing system. Work includes surface preparation, sanding, and finishing of the new floor; application of all required game lines, striping, lettering, and the school logo in accordance with school standards; and final sealing, waxing, and buffing of the completed gymnasium floor to ensure a uniform, durable finish.
AvailableThe Desoto County School District is soliciting sealed bids for the Lake Cormorant High School HVAC Replacement project. The work includes replacing existing HVAC units serving the main office and counselor offices and all associated electrical and plumbing. Official documents are available through Central Bidding, and plans/specifications are available via the Allen & Hoshall planroom; bids are due February 18, 2026 at 2:00 p.m. local time.
Posted Date
-
Due Date
Feb 18, 2026
Close: Feb 18, 2026
The Desoto County School District is soliciting sealed bids for the Lake Cormorant High School HVAC Replacement project. The work includes replacing existing HVAC units serving the main office and counselor offices and all associated electrical and plumbing. Official documents are available through Central Bidding, and plans/specifications are available via the Allen & Hoshall planroom; bids are due February 18, 2026 at 2:00 p.m. local time.
AvailableLee’s Summit R-7 School District is soliciting bids for the HVAC replacement and related renovations at Lee’s Summit North High School, 901 NE Douglas St, Lee’s Summit, Missouri. Work includes general construction, structural, mechanical, and electrical components to complete the replacement. A pre-bid is indicated on the planroom calendar, and bids are due January 29, 2026.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Lee’s Summit R-7 School District is soliciting bids for the HVAC replacement and related renovations at Lee’s Summit North High School, 901 NE Douglas St, Lee’s Summit, Missouri. Work includes general construction, structural, mechanical, and electrical components to complete the replacement. A pre-bid is indicated on the planroom calendar, and bids are due January 29, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →