Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
School HVAC improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the construction of a new building addition including a gym, classrooms, and support spaces, sitework, utilities, and targeted improvements to an existing elementary school cafeteria, multi-purpose room, restroom suite, main entry facade, and fire alarm system.
Posted Date
Jan 7, 2026
Due Date
Feb 3, 2026
Release: Jan 7, 2026
Close: Feb 3, 2026
This RFP is for the construction of a new building addition including a gym, classrooms, and support spaces, sitework, utilities, and targeted improvements to an existing elementary school cafeteria, multi-purpose room, restroom suite, main entry facade, and fire alarm system.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
HVAC Improvements at Elementary School. Electrical Service Upgrades: The scope of work for this project includes but is not limited to the removal and replacement of the existing main building electrical switch gear. The existing system is beyond its useful life, in disrepair and undersized to adequately provide power to a modern building. The electrical service will be upgraded and properly sized to supply power to the existing building with the addition of modern-day technology and the introduction of Air Conditioning. HVAC Upgrades: The existing system is obsolete, beyond its useful life and non-operable. The scope of work for this project includes but is not limited to building wide upgrades and the installation of a new High Efficiency HVAC systems that include heat, ventilation, air conditioning, exhaust, ductwork, and piping. New equipment includes, but it not limited to Classroom Unit Ventilators, Packaged Heating and Cooling Systems.
Posted Date
Jan 2, 2026
Due Date
Feb 11, 2026
Release: Jan 2, 2026
Close: Feb 11, 2026
HVAC Improvements at Elementary School. Electrical Service Upgrades: The scope of work for this project includes but is not limited to the removal and replacement of the existing main building electrical switch gear. The existing system is beyond its useful life, in disrepair and undersized to adequately provide power to a modern building. The electrical service will be upgraded and properly sized to supply power to the existing building with the addition of modern-day technology and the introduction of Air Conditioning. HVAC Upgrades: The existing system is obsolete, beyond its useful life and non-operable. The scope of work for this project includes but is not limited to building wide upgrades and the installation of a new High Efficiency HVAC systems that include heat, ventilation, air conditioning, exhaust, ductwork, and piping. New equipment includes, but it not limited to Classroom Unit Ventilators, Packaged Heating and Cooling Systems.
AvailableConstruct HVAC system replacements and improvements at Fernan Stem Academy, Hayden Meadows Elementary, Coeur d'Alene High School, Lakes Middle School, and the District Office.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Release: Jan 16, 2026
Close: Feb 3, 2026
Construct HVAC system replacements and improvements at Fernan Stem Academy, Hayden Meadows Elementary, Coeur d'Alene High School, Lakes Middle School, and the District Office.
AvailableThis is an Invitation to Bid (ITB) for the Eastlawn Avenue Storm Improvements project (ITB 4602), soliciting construction/storm infrastructure services. The solicitation was published 2026-01-09 and closes 2026-02-10 at 2:00 PM EST; bid documents and buyer contact information are available only to registered BidNet/MITN members. This is a procurement solicitation (not a grant) and was open/active on the current date 2026-01-13.
Posted Date
Jan 9, 2026
Due Date
Feb 10, 2026
Release: Jan 9, 2026
Close: Feb 10, 2026
This is an Invitation to Bid (ITB) for the Eastlawn Avenue Storm Improvements project (ITB 4602), soliciting construction/storm infrastructure services. The solicitation was published 2026-01-09 and closes 2026-02-10 at 2:00 PM EST; bid documents and buyer contact information are available only to registered BidNet/MITN members. This is a procurement solicitation (not a grant) and was open/active on the current date 2026-01-13.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →