CityCA
Aug 5, 2026
Closes
Sep 4, 2026
Bake Parkway Resurfacing Project - Phase 1 (26S01B), Phase 2 (27S01D) and Normandale Drive and Regency Lane Resurfacing Project
Work includes 1 LS traffic signing, striping, markings and legends; 25,2000 sf uniform depth cold mill 3"; 1,600 ton construct 1" ac leveling course; 4,850 ton construct 2" ARHM overlay; 3,750 CY sawcut, excavate & dispose existing roadway section; 5; 5,850 ton construct AC base course; 19,200 sf localized full depth 4. 5" ac patching; 14 RA sawcut, remove & replace ADA compliant curb ramp; 1,500 SF sawcut, remove & replace 4" PCC ADA compliant sidewalk; 1,700 SF sawcut, remove & dispose of existing pavement, curb & gutter, & replace with monolithic pcc bus pad; 2 EA retrofit curb ramp with surface applied truncated domes & grind lip to 0" curb face. See attached file.