CityCA
Posted
Oct 26, 2026
Nov 19, 2026
HSIP Cycle 11 Pedestrian Crossing Enhancements RFP
Work includes 20 LF furnish and install 1. 5" galvanized steel conduit and 2#10 awg conductors in parkway, complete, 1 EA adjust water valve to grade, 1 EA furnish and install 130w led luminaire with mounting bracket, complete, 1 EA demo existing and install new ada curb ramp, retaining curb, and truncated domes, complete, 4 EA remove and salvage existing sign. 12 LF install red curb. See attached file.
