Posted
Sep 4, 2026
Oct 13, 2026
HRD Shield Enclosure (Request For Quotation) Upton
Provide HRD Shield Enclosure.
Description: Brookhaven Science Associates, acting for the U.S. Department of Energy, seeks proposals to design, fabricate, install, test, and warrant high-resolution diffraction shield enclosures for the NSLS-II beamline at Brookhaven National Laboratory. The work includes engineering, manufacturing lead-steel panels, doors, and labyrinths, on-site installation and acceptance testing, and a five-year warranty. Proposals are due October 13, 2026, at 4:00 p.m. EDT, and selection considers technical merit and price on a best-value basis.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Posted
Sep 4, 2026
Oct 13, 2026
Provide HRD Shield Enclosure.
Washington Metropolitan Area Transit Authority
Special DistrictMD
Posted
Sep 17, 2026
Oct 13, 2026
Furnish, deliver, install, test, commission, and warrant one hundred seventy-five (175) fully enclosed operator barrier systems on designated metrobus vehicles.
Washington Metropolitan Area Transit Authority
Special DistrictDC
Posted
Sep 17, 2026
Oct 13, 2026
The Washington Metropolitan Area Transit Authority seeks a contractor to furnish, deliver, install, test, and commission fully enclosed operator barrier systems for Metrobus vehicles. The bid line calls for 175 full driver enclosures with front partitions. The procurement is an invitation for bids under solicitation WMATA-0000010936.
CityGA
Posted
-
Oct 22, 2026
The City of Marietta seeks a design-build team to design and construct a dumpster enclosure at approximately 90 Hansell Street in Marietta, Georgia. The enclosure must hold up to nine typical front-load 8-yard dumpsters and accommodate servicing by front-load garbage trucks on an existing one-way street. A mandatory pre-proposal conference is scheduled for October 13, 2026, and construction is expected to begin January 4, 2027.
Decision makers connected to this RFP from Department of Energy.