Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes residential rehab. Re-wire as needed or required to conform to the national electrical code and replace fresh water supply lines going from the meter to the home.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Home rehab includes accessible bathroom. Include and reinforce new grab bars. Install a new tub and handheld shower faucets including a new valve. Install new shallow depth pedestal sinks and faucets with pop-up drains. Install a new, standard depth, comfort height toilet with a new floor flange and wax ring. Install all new turn brass shutoff valves on fixtures. Install new braided supply lines and replace any old piping and fittings associated with this repair. Replace the bathroom doors and openings with matching doors for wheelchair access. This repair is to include repairing all surrounding areas, new flooring, trims, caulk, paint, as well as new door hardware.
Posted Date
Dec 23, 2025
Due Date
Jan 8, 2026
Release: Dec 23, 2025
Close: Jan 8, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Home rehab includes accessible bathroom. Include and reinforce new grab bars. Install a new tub and handheld shower faucets including a new valve. Install new shallow depth pedestal sinks and faucets with pop-up drains. Install a new, standard depth, comfort height toilet with a new floor flange and wax ring. Install all new turn brass shutoff valves on fixtures. Install new braided supply lines and replace any old piping and fittings associated with this repair. Replace the bathroom doors and openings with matching doors for wheelchair access. This repair is to include repairing all surrounding areas, new flooring, trims, caulk, paint, as well as new door hardware.
AvailableSeeking qualified general contractors for several SHIP, HOME, CDBG, and NSP Rehab projects on an as-needed basis.
Posted Date
Jun 15, 2023
Due Date
Jun 15, 2028
Release: Jun 15, 2023
Close: Jun 15, 2028
Seeking qualified general contractors for several SHIP, HOME, CDBG, and NSP Rehab projects on an as-needed basis.
AvailableThe major items of work are approx: 1,940 CY salvage aggregate surfacing, milled bit; 590 ton shoulder base aggregate class 5; 11,663 SY mill bituminous surface (6"); 3,120 ton type SP 12.5 wearing course mix (2,B); etc.
Posted Date
Dec 29, 2025
Due Date
Jan 29, 2026
Release: Dec 29, 2025
Close: Jan 29, 2026
The major items of work are approx: 1,940 CY salvage aggregate surfacing, milled bit; 590 ton shoulder base aggregate class 5; 11,663 SY mill bituminous surface (6"); 3,120 ton type SP 12.5 wearing course mix (2,B); etc.
AvailableHousing Major Rehab..
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Housing Major Rehab..
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →