Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Home rehab includes accessible bathroom. Include and reinforce new grab bars. Install a new tub and handheld shower faucets including a new valve. Install new shallow depth pedestal sinks and faucets with pop-up drains. Install a new, standard depth, comfort height toilet with a new floor flange and wax ring. Install all new turn brass shutoff valves on fixtures. Install new braided supply lines and replace any old piping and fittings associated with this repair. Replace the bathroom doors and openings with matching doors for wheelchair access. This repair is to include repairing all surrounding areas, new flooring, trims, caulk, paint, as well as new door hardware.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes residential rehab. Re-wire as needed or required to conform to the national electrical code and replace fresh water supply lines going from the meter to the home.
Posted Date
Dec 26, 2025
Due Date
Jan 8, 2026
Release: Dec 26, 2025
Close: Jan 8, 2026
Work includes residential rehab. Re-wire as needed or required to conform to the national electrical code and replace fresh water supply lines going from the meter to the home.
AvailableSeeking qualified general contractors for several SHIP, HOME, CDBG, and NSP Rehab projects on an as-needed basis.
Posted Date
Jun 15, 2023
Due Date
Jun 15, 2028
Release: Jun 15, 2023
Close: Jun 15, 2028
Seeking qualified general contractors for several SHIP, HOME, CDBG, and NSP Rehab projects on an as-needed basis.
AvailableHousing Major Rehab..
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Housing Major Rehab..
AvailableWork includes re-wire as needed or required to conform to the national electrical code as per the county building code. This may require additional switches and outlets to be added if the existing space does not meet code requirements. A new meter base/power pack and riser may be required a new breaker panel may also be required. Install disconnects at equipment and appliances. All smoke detectors should be hardwired with battery back-up. All receptacles, switches and cover plates shall be new devices. All existing and new appliances will have new pigtails installed to match new receptacles. All fixtures shall be led or have led light bulbs installed. Repair drywall damage from rewiring and paint to match as close as possible. Blocking for ceiling fans will be required and a separate switch is required to operate the fan and light kit at all locations where the fans are installed. Install a new doorbell at entry. See outside link.
Posted Date
Dec 23, 2025
Due Date
Jan 8, 2026
Release: Dec 23, 2025
Close: Jan 8, 2026
Work includes re-wire as needed or required to conform to the national electrical code as per the county building code. This may require additional switches and outlets to be added if the existing space does not meet code requirements. A new meter base/power pack and riser may be required a new breaker panel may also be required. Install disconnects at equipment and appliances. All smoke detectors should be hardwired with battery back-up. All receptacles, switches and cover plates shall be new devices. All existing and new appliances will have new pigtails installed to match new receptacles. All fixtures shall be led or have led light bulbs installed. Repair drywall damage from rewiring and paint to match as close as possible. Blocking for ceiling fans will be required and a separate switch is required to operate the fan and light kit at all locations where the fans are installed. Install a new doorbell at entry. See outside link.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis