Hollonville Meter Connection at Hollonville Road Division I & II

Description: Construction consists of Division I - metered connection to the city transmission line complete with pressure reducing valve, meter, and double detector check valve assembly located in two vaults, yard piping, valves, jack & bore steel casing and all associated measures for the complete project. Division II - includes approx 1,300 LF of 8" PVC watermain, fire hydrants, gate valves, erosion control and all associated measures for a complete project.

Buyer
Pike County

County · GA, US

Released
Aug 12, 2026
Closes
Sep 11, 2026(Closed)

Files