Unity Tank R-26-1438 Division I & Division II (Design-Bid-Build)
Aug 6, 2026
Closes
Sep 16, 2026
DIVISION I: Clearing, grubbing, site grading, site work, site piping. Work to include but not limited to construction of tank site, altitude & check valve vault, yard piping, grading, erosion control, electrical controls, and fencing. The grading of the site is required to be complete 60 days after the notice to proceed is given. DIVISION II: 120,000 Gallon Steel Ground Storage Tank and Foundation. To include the design and construction of the ground structure and all related appurtenances as shown on plans.