CityTX
Jun 17, 2026
Closes
Aug 12, 2026
Holleman Substation Construction
Substation construction. Scope of work includes - 14 EA 138 kV low bus switch stand; 11 EA 138 kV high bus switch stand; 9 EA 138 kV three phase low bus 45 degree support stand; 1 EA 12.5 kV high bus switch stand; 2 ea 138 kv h-frame deadend structure; 6 EA 138 kV single phase 11' CT/PT combined stand; see outside link.