CityWA
Posted
Aug 26, 2026
Sep 25, 2026
Description: Perform surface preparation and recoating the exterior of 3.5 mg Hoffman Hill reservoir located near the intersection of Packwood Avenue and Foreman Road. Work includes replacement of seismic actuated valve system, additional roof vent, ner level gauge, and revisions to access platform. Work under this Contract includes surface preparation and recoating the exterior of the 3.5 Million Gallon Hoffman Hill Reservoir located near the intersection of Packwood Avenue and Foreman Road. The reservoir is a ground-level, welded steel storage tank that was constructed in 1999. The tank is 24 feet tall and 160 feet in diameter. The interior of the reservoir was recoated in 2019. Work also includes replacement of a seismic actuated valve system, additional roof vent, new level gauge, and revisions to the access platform includes 5,300 SF removal of mill scale, 1 LS reservoir exterior prep and recoat, 1 LS reservoir containment, 165 LF grout removal and repair.
City · WA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of DuPont.
Adjacent opportunities open for bidding right now.
CityWA
Posted
Aug 26, 2026
Sep 25, 2026
Perform surface preparation and recoating the exterior of 3.5 mg Hoffman Hill reservoir located near the intersection of Packwood Avenue and Foreman Road. Work includes replacement of seismic actuated valve system, additional roof vent, ner level gauge, and revisions to access platform. Work under this Contract includes surface preparation and recoating the exterior of the 3.5 Million Gallon Hoffman Hill Reservoir located near the intersection of Packwood Avenue and Foreman Road. The reservoir is a ground-level, welded steel storage tank that was constructed in 1999. The tank is 24 feet tall and 160 feet in diameter. The interior of the reservoir was recoated in 2019. Work also includes replacement of a seismic actuated valve system, additional roof vent, new level gauge, and revisions to the access platform includes 5,300 SF removal of mill scale, 1 LS reservoir exterior prep and recoat, 1 LS reservoir containment, 165 LF grout removal and repair.
CityAZ
Posted
Aug 11, 2026
Sep 10, 2026
Work includes rehabilitation of the existing reservoir no. 1, built in 2005. This rehabilitation includes but is not limited to replacement of all rafters, all girders, and all roof plates. Some of the roof components will be replaced and all interior and exterior surfaces of the reservoir shall be recoated upon construction completion.
CityWA
Posted
Aug 19, 2026
Sep 16, 2026
This open construction solicitation covers seismic upgrades, renovation, interior remodeling, and expansion of Vancouver Fire Department Fire Station 8, with phased work intended to maintain uninterrupted station operations. INLINE Construction, the City's GC/CM, is handling several bid packages, with a non-mandatory pre-bid conference and job walk scheduled for August 27, 2026, and submissions due September 16, 2026, at 2:00 PM PDT. The posting concerns construction services and bid documents, not a grant program.
CityWA
Posted
Aug 19, 2026
Sep 16, 2026
This open construction solicitation covers seismic upgrades, renovation, interior remodeling, and expansion of Vancouver Fire Department Fire Station 8, with phased work intended to maintain uninterrupted station operations. INLINE Construction, the City's GC/CM, is handling several bid packages, with a non-mandatory pre-bid conference and job walk scheduled for August 27, 2026, and submissions due September 16, 2026, at 2:00 PM PDT. The posting concerns construction services and bid documents, not a grant program.