CountyAL
Posted
Aug 27, 2026
Oct 21, 2026
Prequalification Statements for Mobile County Sportsplex - Phase 3 Championship Field
New County Sportsplex - Phase 3 Championship Field.
Description: Statements of Qualification are being requested for facility-wide improvements, including rehabilitation of the septage receiving station and existing offloading areas; installation of a new packaged septage receiving station; rehabilitation of the existing blower building, including ventilation upgrades and other miscellaneous building improvements; replacement of the existing blower system, including demolition of the existing blowers and electrical equipment and installation of new blowers, associated piping, and electrical equipment; and construction of a new UV disinfection facility.
City · AL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Tuscaloosa.
Adjacent opportunities open for bidding right now.
CountyAL
Posted
Aug 27, 2026
Oct 21, 2026
New County Sportsplex - Phase 3 Championship Field.
Sumner-Fredericksburg Community School District
School DistrictIA
Posted
-
Oct 27, 2026
Project includes the addition of secure entrance with a canopy, along with minor renovations at this connection point to the existing building. The project also includes renovations. Improvements will include updates to the mechanical and electrical systems, as well as new interior construction consisting of steel stud and drywall partitions, casework, and new floor, wall, and ceiling finishes. Anticipated bid packages: 1 general construction; 2 aluminum and glazing; 3 cold metal framing/drywall; 4 suspended ceiling systems; 5 tiling/carpet/base; 6 painting; 7 fire suppression; 8 mechanical complete (plumbing/hvac); 9 electrical complete (electrical/communications/safety and security).
Higher EducationUT
Posted
Oct 1, 2026
Nov 11, 2026
To prequalify new contractorsfor bidding on capital improvement projects. Electrical, general campus, general hospital, hazmat/abatement/demo, mechanical, paving, roofing, & site/civil contractors.
Contra Costa Community College District
Higher EducationCA
Posted
Sep 24, 2026
Oct 12, 2026
Repurposing underutilized space within the existing DVC Book Center Building, which was originally constructed in 2004. Approx. 5,000 SF of open retail space will be infilled with offices, meeting rooms, a restroom, and other student gathering spaces. The work includes new lighting, HVAC systems, and building controls for the affected spaces. There is also approx. 1,000 SF of reconfigured bookstore retail space, including new transaction counters and retail displays.