Landfill Venture Group, Highway G Landfill Commission
Special DistrictWI
Posted
Oct 28, 2026
Nov 13, 2026
C&D Landfill #3 Construction RFP
Work inlcudes construction & demolition (c&d) landfill #3 (#6102) and associated access road.
Description: In general the project consists of constructing an approximately 1.6 acre C&D landfill cell, including site preparation; general earthwork; access road; and associated work.
City · WI, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Landfill Venture Group, Highway G Landfill Commission
Special DistrictWI
Posted
Oct 28, 2026
Nov 13, 2026
Work inlcudes construction & demolition (c&d) landfill #3 (#6102) and associated access road.
Illinois Environmental Protection Agency
State AgencyIL
Posted
-
Dec 31, 2026
Sealed Bids are requested for the construction of Phase 1b, encompassing Contract A-2 (Water Supply Wells), Contract C-2 (Water Treatment Plant), Contract D (Elevated Water Storage Tank), Contract F (Finished Water Transmission Main), and Contract G (Finished Water Transmission Main).
Posted
Nov 4, 2026
Nov 18, 2026
The CSRD has approximately 130,000 m³ of native silty loam soil material available from Phase 3B of the Salmon Arm Landfill, located at the Columbia Shuswap Regional District (CSRD) Salmon Arm Resource and Recovery Facility, 4290 20th Avenue SE. The CSRD views the material as a value resource for beneficial reuse and the CSRD is seeking Responses from contractors who may have the interest and the ability to excavate, load, transport and utilize the material for their own use. While direct per-cubic-meter revenue is preferred, the CSRD will consider innovative proposals where the value of the material offsets other regional district infrastructure or operational costs.
Delaware Solid Waste Authority (DSWA)
State AgencyDE
Posted
Nov 2, 2026
Dec 15, 2026
Work includes mobilization and demobilization, surface preparations of each manhole for lining, which include but is not limited to, surface cleaning, removal of large debris, removal of existing liner, infiltration inspection, grouting, and rinsing; temporary bypass pumping and hauling, replacement of six (6) manhole cones, odor control, and lining of each manhole and pump station using one of the approved epoxy coating material and testing.