OtherTX
Posted
Oct 30, 2026
Nov 17, 2026
Construction of Travis Club - Phase 3B Estates, Phase 3A Estates, and Phase 3A Villas RFP
Construction of Travis Club - Phase 3B Estates, Phase 3A Estates, and Phase 3A Villas.
Description: The CSRD has approximately 130,000 m³ of native silty loam soil material available from Phase 3B of the Salmon Arm Landfill, located at the Columbia Shuswap Regional District (CSRD) Salmon Arm Resource and Recovery Facility, 4290 20th Avenue SE. The CSRD views the material as a value resource for beneficial reuse and the CSRD is seeking Responses from contractors who may have the interest and the ability to excavate, load, transport and utilize the material for their own use. While direct per-cubic-meter revenue is preferred, the CSRD will consider innovative proposals where the value of the material offsets other regional district infrastructure or operational costs.
County · BC, CA
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Columbia Shuswap Regional District.
Adjacent opportunities open for bidding right now.
OtherTX
Posted
Oct 30, 2026
Nov 17, 2026
Construction of Travis Club - Phase 3B Estates, Phase 3A Estates, and Phase 3A Villas.
Niskayuna Central School District
School DistrictNY
Posted
-
Dec 2, 2026
Sealed bids for general construction, plumbing, HVAC, and electrical construction for elementary school renovations.
CityNC
Posted
Sep 30, 2026
Nov 17, 2026
Work under this contract will include construction of a stream and wetland restoration, stormwater outfall modifications, earthen embankment and water control structure, retaining walls, greenway trail, maintenance path, pedestrian plazas, and hardscaped areas.
Delaware Solid Waste Authority (DSWA)
State AgencyDE
Posted
Nov 2, 2026
Dec 15, 2026
Work includes mobilization and demobilization, surface preparations of each manhole for lining, which include but is not limited to, surface cleaning, removal of large debris, removal of existing liner, infiltration inspection, grouting, and rinsing; temporary bypass pumping and hauling, replacement of six (6) manhole cones, odor control, and lining of each manhole and pump station using one of the approved epoxy coating material and testing.