South Carolina Department of Transportation
State AgencySC
Posted
Oct 7, 2026
Dec 6, 2026
Ccr Phase 3a - Frontang Roads and Utilities *Prequalification* RFP
Work includes large public water relocation no 001, small public sewer relocation no 001, cpm progress schedule, clearing and grubbing within right of way 5.000 Acre, removal and disposal of existing pavement 1,462.000 SY, removal and disposal of existing curb 7,830.000 LF, removal and disposal of existing asphalt pavement 45,495.000 SY, removal of exist guardrail 1,508.000 LF, removal and disposal of existing culvert 4'x8', culvert extension preparation, unclassified excavation 199,151.000 CY, borrow excavation 2,000.000 CY, muck excavation 1,417.000 CY, geotextile, separation 20.000 SY, structure excavation for culverts 69.000 CY. See attached file.
