Paradise Unified School District
School DistrictCA
Posted
Oct 25, 2026
Nov 10, 2026
PARADISE ELEMENTARY SCHOOL PHASE 2: BUILDING G RFP
Construction of Phase 2: Building G at Paradise Elementary School.
Description: Sealed Bids are requested for the construction of Phase 1b, encompassing Contract A-2 (Water Supply Wells), Contract C-2 (Water Treatment Plant), Contract D (Elevated Water Storage Tank), Contract F (Finished Water Transmission Main), and Contract G (Finished Water Transmission Main).
StateAgency · IL, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Paradise Unified School District
School DistrictCA
Posted
Oct 25, 2026
Nov 10, 2026
Construction of Phase 2: Building G at Paradise Elementary School.
CountyFL
Posted
Oct 12, 2026
Nov 12, 2026
Work includes 406 SY 5" thick reinforced concrete sidewalk or slab w/ sub-base - bleacher pads, sidewalks; 77 sy 6" thick reinforced concrete pavement with sub-base - drive apron; 3 EA detectable warning surface; 2,200 LF galvanized chain link fence - 8.0' height 6-gauge galvanized chain link fence, posts, footings, fasteners, etc; 2 EA single swing gate - 8.0' height x 4' wide 6-gauge galvanized chain link gate, latch hardware, posts, footings, fasteners, etc. ; 1 ea double swing gate - 8.0' height x 8' wide (two 4' panels) 6-gauge galvanized chain link gates, latch hardware, posts, footings, fasteners, etc. See attached file.
Special DistrictCA
Posted
Sep 1, 2026
Nov 13, 2026
Work includes installation of a multi-stage well pump and 250 horsepower submersible motor capable of delivering not less than 1500 gpm of well water at a total design head of 469.5 feet.
CountyFL
Posted
Oct 26, 2026
Nov 25, 2026
Work includes 200 SY demolition of asphalt sidewalk; 1 LS demolition of existing landscaping; 1 LS install slip resistant coating; 13,200 SF pressure washing existing phase 1 canopy structure; 7,000 SF repainting existing phase 1 canopy structure; 1 LS pedestrian wayfinding and signage; 1,875 SF pre-engineered fabric column-supported canopy (parking lot a to 2nd curb); 1 EA digital message sign (large overhead gantry display); 8 EA electrical trash can and compactor; 12 EA install cctv complete (fixture, mounting brackets, mounting arm, connections, hardware). See attached file.
Decision makers connected to this RFP from Illinois Environmental Protection Agency.