CityOH
Posted
Aug 20, 2026
Sep 10, 2026
Rock Road Lift Station Force Main Replacement - Phase 1
Work includes approx 5,800 LF of 12" force main.
Description: Installation of approx., 740 LF of 10" diameter PVC force main along us highway 51. The project also consists of an asphalt roadway patch, erosion control, and restoration.
SpecialDistrict · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityOH
Posted
Aug 20, 2026
Sep 10, 2026
Work includes approx 5,800 LF of 12" force main.
Lexington County Joint Municipal Water And Sewer Authority
Special DistrictSC
Posted
Jul 30, 2026
Sep 8, 2026
Project will consist of the installation of approx 3,900 LF of 12" force main and approx 2,000 LF of 16" force main. Project will also include 3 horizontal directional bores with casing below existing roadways.
Kershaw Co And Lee Co Regional Water Authority
Special DistrictSC
Posted
-
Sep 10, 2026
Work includes approx 170 LF of 24" steel casing bore & jack; 225 LF of 4" DR 11 HDPE directional bore (casing); 65 EA concrete valve markers; 704 LF of cut and replace asphalt driveway.
Posted
-
Sep 3, 2026
Work includes approx 592 LF of 12" PVC (SDR 26, ASTM D-3034) pipe; 265 SY 7" reinforced concrete pavement; 91 LF of 12" RCP C76 class III; 6 EA type I sanitary manhole.