CountyMD
Aug 7, 2026
Closes
Sep 9, 2026
Trimble Road Water Main Extension Contract No. W-60 RFP
Work includes 1300, LF of 3" hdpe sdr9 water main, 1750 LF of 2" hdpe sdr9 water main, 1 EA of air release valve, 200 TN hot mix asphalt - patch, 150 TN hot mix asphalt - overlay, 40 TN cr-6 driveway stone, erosion and sediment control, 1 EA 2 gate valve and box, 5 CY test pit excavation (contingent), 5 CY rock excavation (contingent), traffic control. See attached file.