CityFL
Posted
Sep 14, 2026
Oct 6, 2026
Go Bond Project: Pool Deck Repair and Resurfacing - John E. Mullin Park RFP
Prepare, repair, resurface, texture, color, and seal the existing concrete pool deck. The work shall include approx. 17,300 SF of existing pool deck surrounding the aquatic facility. The splash pad is excluded from this project. See outside link.