Northeast Prairie Reserve Bike Path Improvements
Construction of a new 8' wide bike path. This path will be approx. , 4200' long. Description: 400 un of tree removal (6 to 15 units diameter); 400 un of tree removal (over 15 units diameter); 550 ft of temporary fence; 3500 ft of tree root pruning; 2100 cy of earth excavation; 50 cy of removal and disposal of unsuitable material; 3930 sy of geotechnical fabric for ground stabilization; 4905 sy of topsoil furnish and place 4"; 1420 sy of topsoil furnish and place 6"; 1010 ac of seeding, class 1; 1400 sy of seeding, class 4a; 90 lbs of nitrogen fertilizer nutrient; 90 lbs of phosphorus fertilizer nutrient; 90 lbs of potassium fertilizer nutrient; 5105 sy of erosion control blanket; 100 un of supplemental watering; 7 ea of inlet and pipe protection; 170 sy of stone riprap, class a4. See attached file.