Open RFP

Hertford WWTP Rehabilitation

Description: The project will consist of the rehabilitation and replacement of multiple items at the Hertford Wastewater Treatment Plant (WWTP). Work at the headworks will include replacement of the grit removal system, one (1) influent pump, one (1) VFD and modifications to the associated electrical. The oxidation ditch modifications will include concrete rehabilitation of the structure, as well as replacement of three (3) mud valves, three (3) knife gates, three (3) sluice gates, a weir gate, and a rotating plate weir. The oxidation ditch will also be fitted with two additional catwalks to allow for maintenance of the brush aerators. Modifications to the splitter box will include the replacement of all three (3) of the slide gates. The telescoping valve in the sludge holding basin will be removed and replaced. The fine bubble aeration system will be replaced in the aerobic digester. At the chlorine contact basin and effluent pump station the disc filters will be removed, the two (2) slide gates will be replaced, three (3) check valves will be replaced, one (1) effluent pump, three (3) VFDs, and the associated electrical. Replacing the SCADA and the addition of a security system are also included under this project.

Buyer
City of Raleigh

City · NC, US

Released
Aug 20, 2026
Closes
Sep 25, 2026(22 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts