Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Heat of Rejection Equipment Replacement. Testing, adjusting, and balancing (tab) of the hvac systems, plumbing systems, and related ancillary equipment will be performed by an independent, third party, aabc certified agency, selected and employed directly by the contractor. The preparation and corrections necessary for the testing and balancing of these systems, as described herein, are the responsibility of the contractor. As part of the project construction contract, the contractor shall make any changes or replacements to the sheaves, belts, dampers, valves, or other components required for correct balance as advised by the tab agency, at no additional cost to the owner. The contractor shall provide and coordinate the services of qualified, responsible subcontractors, suppliers and personnel as required to correct, repair, and/or replace any and all deficient items or conditions found during the course of this project, including the testing, adjusting, and balancing period.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Contractor shall provide permanent installation of two new 3-ton 15 SEER heat pump packaged units with 8KW electric heat strips in the two quarters buildings (one unit/building) at Bears Bluff NFH in the following manner. This project requires the conversion of a split HVAC system to a packaged HVAC system. Remove existing HVAC units, including indoor and outdoor components of split unit. All refrigerant handling and disposal to be done by contractor. Properly dispose of all material off site. Locate HVAC packaged units outside of each quarters building as close as possible to existing units. Contractor will visually mark the proposed location and obtain approval from station Project Leader before proceeding with installation. Install new 3-ton 15 SEER2 heat pump packaged unit outside of each quarters building on new equipment pad. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
Contractor shall provide permanent installation of two new 3-ton 15 SEER heat pump packaged units with 8KW electric heat strips in the two quarters buildings (one unit/building) at Bears Bluff NFH in the following manner. This project requires the conversion of a split HVAC system to a packaged HVAC system. Remove existing HVAC units, including indoor and outdoor components of split unit. All refrigerant handling and disposal to be done by contractor. Properly dispose of all material off site. Locate HVAC packaged units outside of each quarters building as close as possible to existing units. Contractor will visually mark the proposed location and obtain approval from station Project Leader before proceeding with installation. Install new 3-ton 15 SEER2 heat pump packaged unit outside of each quarters building on new equipment pad. See attached file.
AvailableQty 2 EA of Heat Pump 7.5 ton; Qty 4 EA of Heat Pump 2.5 ton; Qty 7 EA of Heat Pump 5 ton.
Posted Date
Nov 5, 2025
Due Date
Dec 16, 2025
Release: Nov 5, 2025
Close: Dec 16, 2025
Qty 2 EA of Heat Pump 7.5 ton; Qty 4 EA of Heat Pump 2.5 ton; Qty 7 EA of Heat Pump 5 ton.
AvailableProvide AV equipment replacement DS.
Posted Date
Dec 1, 2025
Due Date
Jan 6, 2026
Release: Dec 1, 2025
Close: Jan 6, 2026
Provide AV equipment replacement DS.
AvailableRelease: Dec 10, 2025
Close: Dec 14, 2025
Playground Equipment Replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis