Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnish and install three new Bosch WW420 (or similar) water-to-water heat pumps in Hall.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Contractor shall provide permanent installation of two new 3-ton 15 SEER heat pump packaged units with 8KW electric heat strips in the two quarters buildings (one unit/building) at Bears Bluff NFH in the following manner. This project requires the conversion of a split HVAC system to a packaged HVAC system. Remove existing HVAC units, including indoor and outdoor components of split unit. All refrigerant handling and disposal to be done by contractor. Properly dispose of all material off site. Locate HVAC packaged units outside of each quarters building as close as possible to existing units. Contractor will visually mark the proposed location and obtain approval from station Project Leader before proceeding with installation. Install new 3-ton 15 SEER2 heat pump packaged unit outside of each quarters building on new equipment pad. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 14, 2026
Contractor shall provide permanent installation of two new 3-ton 15 SEER heat pump packaged units with 8KW electric heat strips in the two quarters buildings (one unit/building) at Bears Bluff NFH in the following manner. This project requires the conversion of a split HVAC system to a packaged HVAC system. Remove existing HVAC units, including indoor and outdoor components of split unit. All refrigerant handling and disposal to be done by contractor. Properly dispose of all material off site. Locate HVAC packaged units outside of each quarters building as close as possible to existing units. Contractor will visually mark the proposed location and obtain approval from station Project Leader before proceeding with installation. Install new 3-ton 15 SEER2 heat pump packaged unit outside of each quarters building on new equipment pad. See attached file.
AvailableHeat pump replacement and mechanical renovation project.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Heat pump replacement and mechanical renovation project.
AvailableGrant funding for the installation or replacement of geothermal heat pump systems.
Posted Date
-
Due Date
Dec 31, 2026
Close: Dec 31, 2026
Grant funding for the installation or replacement of geothermal heat pump systems.
AvailableThe City of Vancouver, Washington is rebidding an Invitation to Bid to refurbish the City Hall’s ground source heat pump (GSHP) system, including recovery and replacement of three well pumps, realignment of GSHP piping, new penthouse pumps, and updated valving. Contractors must coordinate with City-provided temporary heating and cooling to maintain indoor conditions. The work must be physically complete within 180 working days from Notice to Proceed, with a final physical completion no later than October 31, 2026.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
The City of Vancouver, Washington is rebidding an Invitation to Bid to refurbish the City Hall’s ground source heat pump (GSHP) system, including recovery and replacement of three well pumps, realignment of GSHP piping, new penthouse pumps, and updated valving. Contractors must coordinate with City-provided temporary heating and cooling to maintain indoor conditions. The work must be physically complete within 180 working days from Notice to Proceed, with a final physical completion no later than October 31, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →