Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Science and technology replacement pre-heat coils.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor shall provide permanent installation of two new 3-ton 15 SEER heat pump packaged units with 8KW electric heat strips in the two quarters buildings (one unit/building) at Bears Bluff NFH in the following manner. This project requires the conversion of a split HVAC system to a packaged HVAC system. Remove existing HVAC units, including indoor and outdoor components of split unit. All refrigerant handling and disposal to be done by contractor. Properly dispose of all material off site. Locate HVAC packaged units outside of each quarters building as close as possible to existing units. Contractor will visually mark the proposed location and obtain approval from station Project Leader before proceeding with installation. Install new 3-ton 15 SEER2 heat pump packaged unit outside of each quarters building on new equipment pad. See attached file.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
Contractor shall provide permanent installation of two new 3-ton 15 SEER heat pump packaged units with 8KW electric heat strips in the two quarters buildings (one unit/building) at Bears Bluff NFH in the following manner. This project requires the conversion of a split HVAC system to a packaged HVAC system. Remove existing HVAC units, including indoor and outdoor components of split unit. All refrigerant handling and disposal to be done by contractor. Properly dispose of all material off site. Locate HVAC packaged units outside of each quarters building as close as possible to existing units. Contractor will visually mark the proposed location and obtain approval from station Project Leader before proceeding with installation. Install new 3-ton 15 SEER2 heat pump packaged unit outside of each quarters building on new equipment pad. See attached file.
AvailableConcrete pavement replacement and pre-paid sidewalk improvements.
Posted Date
Jan 6, 2026
Due Date
Jan 22, 2026
Release: Jan 6, 2026
Close: Jan 22, 2026
Concrete pavement replacement and pre-paid sidewalk improvements.
AvailableProvide electrical steel coils.
Posted Date
Dec 8, 2025
Due Date
Jan 12, 2026
Release: Dec 8, 2025
Close: Jan 12, 2026
Provide electrical steel coils.