Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide HVAC air handler maintenance and filter service.
Posted Date
Dec 8, 2025
Due Date
Feb 6, 2026
Release: Dec 8, 2025
Close: Feb 6, 2026
Provide HVAC air handler maintenance and filter service.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Pre-Conditioned Air HVAC Units Removal and Installation. Demolish and dispose/store at the City’s discretion, twenty (20) existing Jet Bridge Mount heating, ventilation, and air conditioning units (HVAC) units; and to install twenty (20) Pre-Conditioned Air (PCA) 30-Ton DX-3 Circuit - Jet Bridge Mount HVAC units at various passenger jet bridges.
Posted Date
Jan 22, 2026
Due Date
Feb 20, 2026
Release: Jan 22, 2026
Close: Feb 20, 2026
Pre-Conditioned Air HVAC Units Removal and Installation. Demolish and dispose/store at the City’s discretion, twenty (20) existing Jet Bridge Mount heating, ventilation, and air conditioning units (HVAC) units; and to install twenty (20) Pre-Conditioned Air (PCA) 30-Ton DX-3 Circuit - Jet Bridge Mount HVAC units at various passenger jet bridges.
AvailableThe Project consists of the construction of replacement of the existing mechanical equipment, air handler, and boilers in the mechanical mezzanine in the weight room.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
The Project consists of the construction of replacement of the existing mechanical equipment, air handler, and boilers in the mechanical mezzanine in the weight room.
Release: Aug 13, 2025
Close: Nov 28, 2026
Air Handler Refurbishment
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →