Special DistrictTX
Posted
-
Oct 16, 2026
Wastewater Treatment Plant Expansion To 0.9 MGD RFP
New submersible lift station, new 40-foot diameter clarifier, new aeration basin, construction of a sludge transfer station, expansion of the chlorine contact basin, new elevated concrete platforms, new disinfection and dechlorination systems, and replacement of coarse bubble aeration system with fine bubble aeration system, including electrical controls, conduit, wiring and programming. Additional site work includes concrete pavement, perimeter fencing, grading, drainage, and detention. Alternate 1 - coat existing digester/thickener no. 1 and digester/thickener no. 2 (9,000 SF).