Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consist of traffic control, 2 ea of remove & replace sewer manhole, pavement restoration, sewage bypass.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Santa Cruz (Public Works) is soliciting sealed bids to remove and replace two sewer manholes at Harbor Dr & Windsor St and West Cliff Dr & David Way, reconnect the new manholes to existing sanitary sewer piping, and restore asphalt pavement. The engineer's estimate for the project is $58,000 and the solicitation is issued as IFB No. PW-0270. Bids are due January 27, 2026 at 2:00 PM Pacific Time and the posting is active as of 2026-01-13.
Posted Date
Jan 7, 2026
Due Date
Jan 27, 2026
Release: Jan 7, 2026
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Santa Cruz (Public Works) is soliciting sealed bids to remove and replace two sewer manholes at Harbor Dr & Windsor St and West Cliff Dr & David Way, reconnect the new manholes to existing sanitary sewer piping, and restore asphalt pavement. The engineer's estimate for the project is $58,000 and the solicitation is issued as IFB No. PW-0270. Bids are due January 27, 2026 at 2:00 PM Pacific Time and the posting is active as of 2026-01-13.
Emergency repair or replacement of underground sewer mains & manhole structures.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Emergency repair or replacement of underground sewer mains & manhole structures.
AvailableWork consists of manhole covers replacement.
Posted Date
Jan 9, 2026
Due Date
Jan 28, 2026
Release: Jan 9, 2026
Close: Jan 28, 2026
Work consists of manhole covers replacement.
AvailableThe Western Virginia Water Authority (WVWA) is soliciting bids for a unit price contract for manhole frame and cover replacement, including asphalt cutting, removal of existing structures, replacement with Authority-provided new manhole frames, covers, or screw top valve boxes, concrete work, backfilling, and asphalt patching.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
The Western Virginia Water Authority (WVWA) is soliciting bids for a unit price contract for manhole frame and cover replacement, including asphalt cutting, removal of existing structures, replacement with Authority-provided new manhole frames, covers, or screw top valve boxes, concrete work, backfilling, and asphalt patching.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →