CountyNC
Posted
May 22, 2026
Oct 29, 2026
Hal Marshall Center MCSO Parking Lot Drainage and Pavement Repairs *REBID*
Parking lot drainage and pavement repairs.
Description: Mecklenburg County is rebidding construction work for drainage and pavement repairs at the Hal Marshall Center MCSO parking lot, located at 700 N Tryon St., Charlotte, North Carolina. Sealed proposals from North Carolina-licensed general contractors are due at 2:00 p.m. on October 29, 2026, at the Mecklenburg County Asset & Facility Management Department; bidders must submit a written letter of interest to the county’s design consultant at least 48 hours before bid opening. Bid documents are available digitally at no cost from CES Group Engineers, LLP, and bid, performance, and payment and material bonds are required.
County · NC, US
Decision makers connected to this RFP from Mecklenburg County.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CountyNC
Posted
May 22, 2026
Oct 29, 2026
Parking lot drainage and pavement repairs.
CityTX
Posted
Oct 19, 2026
Oct 28, 2026
Demolition of existing parking lot and site, 8” reinforced concrete pavement, complete in place .4” reinforced concrete sidewalk pavement, complete in place. Covered picnic areas including structure and concrete slab on 18” compacted select fill. Galvanized steel picnic tables, complete in place.
FederalDC
Posted
Oct 22, 2026
Nov 23, 2026
This project involves the repair and resurfacing of three parking lots, including crack sealing, pavement patching, seal coating and re-striping.
California State University Long Beach
Higher EducationCA
Posted
Sep 3, 2026
Nov 12, 2026
Complete removal of the existing 4 inch asphalt pavement and the upper 18 inches of soil (which includes 12-14 inches of cement-treated soil). The new asphalt section will consist of a minimum of 4 inches of asphalt placed over non-expansive fill compacted to a minimum of 95% relative compaction. The scope also includes converting 9 EV ready stalls to full EV charging capability and restriping.