Prequalification of Prospective Bidders for Parking Lot E8 Repairs
Posted
Sep 3, 2026
Nov 12, 2026
Complete removal of the existing 4 inch asphalt pavement and the upper 18 inches of soil (which includes 12-14 inches of cement-treated soil). The new asphalt section will consist of a minimum of 4 inches of asphalt placed over non-expansive fill compacted to a minimum of 95% relative compaction. The scope also includes converting 9 EV ready stalls to full EV charging capability and restriping.
