Posted
Sep 4, 2026
Oct 2, 2026
Green Oaks and Orchard Road Bridge Rail Replacement Project
Work includes approx 154 LF of Removal of Bridge Railing; 150 LF of Removal of Guardrail Type 3; 154 LF of Reset Timber Fascia; 258 LF of Guardrail Type 3 (31" Midwest Guardrail System); 154 LF of Bridge Rail Type 10M (Special); 25 LF of Conrete Curb and Gutter Type 2 (Section IIB).