Closing soon

Green Acres Water Main Replacement

Description: The project generally consists of the installation of 6,460 LF of 8" ductile iron water main and 480 LF of 6" ductile iron water main, along with the construction of twenty (20) new fire hydrant assemblies and associated appurtenances. Work also includes the transfer of existing water services to the new distribution system, abandonment of obsolete water infrastructure, and restoration of disturbed areas. Roadway improvements include 6,120 SY of concrete pavement replacement and 485 LF of concrete curb and gutter replacement. The project will require implementation and maintenance of erosion and sedimentation control measures throughout construction, including stabilization of disturbed areas, inlet protection, dust control, and other best management practices necessary to comply with applicable permitting requirements. 28 EA 8" gate valve w/box, 1 EA 4'x8' construction sign.

Buyer
City of Covington

City · GA, US

Released
Jun 1, 2026
Closes
Aug 27, 2026(5 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts