CityCT
Posted
Oct 2, 2026
Oct 19, 2026
Boiler Replacement At WWTP Beacon Falls RFP
Waste water treatment plant boiler replacement project.
Description: The complete replacement of the existing equalization basin geomembrane liner system wwtp and the complete replacement of the existing equalization basin geomembrane liner system at wwtp as well as all necessary subgrade preparation and installation of appurtenances at both sites.
City · SC, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityCT
Posted
Oct 2, 2026
Oct 19, 2026
Waste water treatment plant boiler replacement project.
CityAR
Posted
Aug 17, 2026
Oct 20, 2026
Project includes Phase II improvements to convert Conway Corporation Tucker Creek Wastewater Treatment Plant to an equalization storage facility. The project principally includes treatment pond sludge removal, demolition and the installation of site piping, valves, slide gate, electric actuators, and all appurtenances to complete the project as shown on the plans and indicated in the specifications.
Special DistrictKY
Posted
Oct 6, 2026
Oct 29, 2026
The project generally consists of, but is not limited to providing all labor, equipment, materials, supplies, tools, and supervision necessary to complete the removal of two existing aeration blowers and the installation of three new high-speed single-stage blowers with associated improvements.
Bethany Warr Acres Public Works Authority
Special DistrictOK
Posted
Sep 30, 2026
Nov 16, 2026
This project consists of comprehensive upgrades and expansion of the Bluff Creek Wastewater Treatment Plant, including new flow metering and diversion structures, headworks and treatment process improvements, construction of new grit removal, blower, digester, and chemical feed facilities, and rehabilitation of existing pumping, filtration, and solids handling systems. The work also includes installation of new process equipment, piping, instrumentation, and appurtenances to improve treatment capacity, operational reliability, and regulatory compliance.
Decision makers connected to this RFP from City of Anderson.