City Of Richmond
Work includes 300 CY of regular excavation (no asphalt or concrete), 50 Ton of crushed aggregate, type I, no. 21a or b, in place, 800 LF of saw cut up to 6" deep, 9000 SY of grass seed, lime, and fertilizer, 50 SY of 6" concrete wheelchair ramp (new), 10 Ton of asphalt type sm-9. 5 a, im-19. 0 a, or bm-25, 100 SY of asphalt milling, up to 2" of average depth, 400 LF of concrete curb, various width x 18" height, complete in place, saw cut to paid separately if needed. Note: does not include excavation or pavement tie-in. Typically used for wheelchair ramps or at back of sidewalk. See attached file.
FY_25_Sidewalk_Program
Release
Sep 30, 2024
Close
Oct 30, 2024