2027 CIPP LINING PROJECT RFP
Rehabilitation of 6", 8", 10" and 12" sewer mains using cured-in-place pipe (CIPP) lining.
Description: Work includes approx 5,077 LF 8" CIPP liner by UV cure; 77 EA service lateral reinstatement and sealing.
SpecialDistrict · OR, US
From the first pre-RFP signals to the published RFP and its files.
Strategic plan
498 days before RFP
RVSS's Strategic Plan set a target to replace or rehabilitate 12,000 feet of concrete and asbestos-cement pipe annually.
Task 1.6 Replace/Rehabilitate all concrete and asbestos cement pipe. Our system contains over 116 miles of concrete and asbestos cement pipe. All of these pipes are over 50 years old. Our target for this task is to replace or rehabilitate 2% of all concrete and AC pipe every year. This would result in 12,000 feet of pipe each year. In
Rogue Valley Sewer Services Strategic Plan 2025-2030
Strategic plan · Jun 18, 2025
Budget
120 days before RFP
RVSS's adopted FY27 budget includes $300,000 for FY CIPP Jobs.
ROGUE VALLEY SEWER SERVICES This "Plan" represents best projections CAPITAL IMPROVEMENT PROJECTS Conditions may warrant changes to plan FY27 ADOPTED BUDGET Actual Projected Budgeted Projection Projection Projection Projection Proj # FY25 FY26 FY27 FY28 FY29 FY30 FY31 Collection System SDC RVSS Yearly Smoke Testing J371 20,000 20,000 20,000 20,000 20,000…
Rogue Valley Sewer Services FY2026-27 Budget
Budget · Jul 1, 2026
Agenda packet
15 days before RFP
RVSS was finishing contract documents for the FY 2026 Jacksonville CIPP project and planned to bid it in December.
J374, FY 2026 CIPP Projects, JV This project will utilize Cured in Place Pipe technology to line approximately existing concrete sewer lines in Jacksonville. CIPP technology will be utilized as an alternative to traditional trenching or pipe realignment where pipes are under existing structures or in high traffic roadways requiring long term traffic…
Rogue Valley Sewer Services Board Of Directors Regular Meeting
Agenda packet · Oct 14, 2026
Agenda packet
15 days before RFP
RVSS planned a January-or-February bid for the Gold Hill sewer project, including CIPP rehabilitation of two existing crossings.
J362 4th St Gold Hill RR Crossing Abandonment, GH This project will install approximately 1,600' of 8 inch sewer along 4th Street in Gold Hill. The new sewer main will replace and re-grade the existing sewer system in order to abandon two of the four existing sewer mains which cross the railroad tracks. The existing 6" crossings are on the special cleaning…
Rogue Valley Sewer Services Board Of Directors Regular Meeting
Agenda packet · Oct 14, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (34 days left)
Adjacent opportunities open for bidding right now.
Special DistrictCA
Posted
Oct 29, 2026
Dec 2, 2026
Rehabilitation of 6", 8", 10" and 12" sewer mains using cured-in-place pipe (CIPP) lining.
South Texas Independent School District
School DistrictTX
Posted
Oct 27, 2026
Nov 5, 2026
Provide HVAC projects.
School DistrictMI
Posted
Oct 12, 2026
Nov 10, 2026
The Troy School District will receive firm, sealed bids for all labor, material, equipment, and all other services to complete Bid No. 2627-03 Roofing at Morse Elementary School and Hamilton Elementary School. Bid Project Manual, Specifications and proposal forms can be obtained online at the Troy School District purchasing/bids site. Bid documents will be placed on BuildingConnected by October 16, 2026, by 3:00 pm Local Time. Sealed bids should be submitted through BuildingConnected. No physical bids will be accepted in person or via delivery service. Bids are to be submitted no later than 1:00 pm on November 10, 2026. The District will not consider or accept a bid received after the date and time specified for bid submission. Bids will be publicly opened immediately following the close of receiving bids with a virtual meeting. No oral, email, telephonic or telegraphic proposals shall be considered. A non-mandatory pre-bid meeting has been scheduled for 9:00 am, Friday, October 30, 2026, at Hamilton Elementary School located at 5625 Northfield Pkwy, Troy, MI 48098. (After the bid meeting, the roofing contractors will have access to walk the roofs).
CityMA
Posted
Oct 16, 2026
Nov 6, 2026
Cape sealing four roads within the town. The work under this contract consists of applying a cape seal surface treatment at various locations.
Decision makers connected to this RFP from Rogue Valley Sewer Services.