Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include tree removal, traffic control, adjustment of survey monument and utility boxes, frames, and covers, protection of underground utility services (e.g., gas, water, sewer, electrical, telecom), concrete sidewalk, concrete driveways, concrete valley gutter, concrete curb, curb, and gutter, curb ramps, storm drain infrastructure improvements, asphalt concrete paving, and curb painting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
2026 curb and sidewalk program project.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
2026 curb and sidewalk program project.
AvailableClose: Feb 3, 2026
2026 ADA - funded curb ramp replacement project.
AvailableProject consist of approx 165 CY of excavation; 350 CY of 6" concrete sidewalk; 200 TON of 1/4" Crushed Aggregate Base Course; 200 LF of Reinforcement Bars for Curb and Sidewalk; 2 EA of Adjust Manhole and Provide New Casting. See outside link.
Posted Date
Jan 13, 2026
Due Date
Jan 29, 2026
Release: Jan 13, 2026
Close: Jan 29, 2026
Project consist of approx 165 CY of excavation; 350 CY of 6" concrete sidewalk; 200 TON of 1/4" Crushed Aggregate Base Course; 200 LF of Reinforcement Bars for Curb and Sidewalk; 2 EA of Adjust Manhole and Provide New Casting. See outside link.
AvailableThe work consist of approx 500 Lf concrete sawing; 9,000 SF remove concrete flatwork; 10 SY remove concrete pavement; 5,000 SF 4" concrete sidewalk; 200 SF detectable warning surfaces; 200 LF type A pedestrian curb .
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
The work consist of approx 500 Lf concrete sawing; 9,000 SF remove concrete flatwork; 10 SY remove concrete pavement; 5,000 SF 4" concrete sidewalk; 200 SF detectable warning surfaces; 200 LF type A pedestrian curb .
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis