Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of De Pere
Project 26-01 for which proposals are being sought includes the following approximate quantities:100 LF relay 8" sanitary sewer and associated appurtenances; 3400 LF relay or pipe bursting sanitary laterals (4" and 6") and associated appurtenances; 3300 LF new and relay storm sewer (8" to 36") and associated appurtenances; 1900 LF new storm lateral installation (6"); 5820 LF relay or directional drill 8" water main and associated appurtenances; 1800 LF relay water service (1"); 1800 CY unclassified excavation; 2500 TONS 1 1/4” crushed aggregate base course; 7300 SY asphaltic concrete pavement pulverizing; 2400 TONS asphaltic concrete pavement placement; 3200 LF replace concrete curb and gutter; 1000 SY replace concrete sidewalks, driveways, and pedestrian curb ramps (4" to 6"); Restoration.
Posted Date
Mar 26, 2026
Due Date
Apr 9, 2026
Release: Mar 26, 2026
City of De Pere
Close: Apr 9, 2026
Project 26-01 for which proposals are being sought includes the following approximate quantities:100 LF relay 8" sanitary sewer and associated appurtenances; 3400 LF relay or pipe bursting sanitary laterals (4" and 6") and associated appurtenances; 3300 LF new and relay storm sewer (8" to 36") and associated appurtenances; 1900 LF new storm lateral installation (6"); 5820 LF relay or directional drill 8" water main and associated appurtenances; 1800 LF relay water service (1"); 1800 CY unclassified excavation; 2500 TONS 1 1/4” crushed aggregate base course; 7300 SY asphaltic concrete pavement pulverizing; 2400 TONS asphaltic concrete pavement placement; 3200 LF replace concrete curb and gutter; 1000 SY replace concrete sidewalks, driveways, and pedestrian curb ramps (4" to 6"); Restoration.
AvailableCity of De Pere
1,600 LF of new sanitary sewer (8") and associated appurtenances; 1,850 LF of new water main (8") and associated appurtenances; 2,350 LF of new storm sewer (8" to 30") and associated appurtenances; 19,600 CY of pond unclassified excavation; 1,500 CY of unclassified excavation; 2,900 TON of crushed aggregate base course-15" depth; 3,800 LF of new concrete curb and gutter; 1,450 TON of asphaltic concrete pavement placement.
Posted Date
Mar 17, 2026
Due Date
Apr 8, 2026
Release: Mar 17, 2026
City of De Pere
Close: Apr 8, 2026
1,600 LF of new sanitary sewer (8") and associated appurtenances; 1,850 LF of new water main (8") and associated appurtenances; 2,350 LF of new storm sewer (8" to 30") and associated appurtenances; 19,600 CY of pond unclassified excavation; 1,500 CY of unclassified excavation; 2,900 TON of crushed aggregate base course-15" depth; 3,800 LF of new concrete curb and gutter; 1,450 TON of asphaltic concrete pavement placement.
AvailableCity of De Pere
Work includes approx. 8,400 SY of new 9" doweled concrete pavement with integral curb; 3,800 LF of new integral concrete curb and gutter; 460 SY of remove and replace concrete sidewalk, driveway, and ramps (4" to 8" concrete); 500 TON of crushed aggregate base course; 4,300 LF of electrical wiring; 1,350 LF of conduit; street light installation; pavement markings; landscape restoration; traffic Control.
Posted Date
Mar 19, 2026
Due Date
Apr 2, 2026
Release: Mar 19, 2026
City of De Pere
Close: Apr 2, 2026
Work includes approx. 8,400 SY of new 9" doweled concrete pavement with integral curb; 3,800 LF of new integral concrete curb and gutter; 460 SY of remove and replace concrete sidewalk, driveway, and ramps (4" to 8" concrete); 500 TON of crushed aggregate base course; 4,300 LF of electrical wiring; 1,350 LF of conduit; street light installation; pavement markings; landscape restoration; traffic Control.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $25,000, use sole source.
Coops: If reseller route stalls, pivot to a cooperative purchasing path to bypass formal bidding.
City of De Pere, WI: Sole source above the $25,000 competitive bidding threshold is rarely used.
Board meetings and strategic plans from City of De Pere
The council held a meeting that included public hearings regarding a zoning map amendment for the Kingston Preserve subdivision to remove an outdated PDD overlay, and a zoning map amendment for a parcel at 12,200 Employers Boulevard. Additionally, a project update was provided regarding the Southbridge Connector, focusing on aesthetic treatments for bridges, piers, and related infrastructure, including discussions on stone veneer, stain options, railings, and lighting configurations.
The committee reviewed and approved an application for a Class A fermented malt beverage and Class A intoxicating liquor license for Homegrown Farmshed LLC.
The committee discussed and acted on community service grant policies, approved the overhire of a police officer and a firefighter to preemptively manage staffing and training needs, reviewed a redevelopment agreement for a multi-tenant commercial space at 303 Reed Street, evaluated a project involving a construction supply business in the West Business Park that requires utility easement coordination, and addressed the financial closure of Tax Increment District 8, recommending the city's surplus portion be transferred to the capital equipment fund.
The Sustainability Commission received a presentation from ICLEI USA regarding their climate resilience and sustainability support tools, specifically the Clear Path 2.0 emissions tracking software. The presentation covered the benefits of membership, including technical assistance and peer learning cohorts, and discussed how the software can be used for climate action planning, emissions inventories, and modeling the shift to sustainable energy alternatives. The commission also discussed its ongoing engagement with the Wisconsin Local Government Climate Coalition and reviewed requirements for state emissions reporting.
The meeting included public comments regarding the lack of regular bus routes in DePere since 2019 and concerns about controlling the local deer population. Key agenda items addressed new business, including the approval of revising the arboriculture specifications manual concerning tree planting to allow steering towards large stature trees, the approval of a pop-up beer garden fundraiser hosted by Stubborn Brothers to benefit the DePere Dog Park, approval for K Distributing as the beer vendor for 2026 to 2028 beer gardens, and approval of the beer garden revenue policy. Additionally, authorization was sought to use up to $10,000 from unassigned reserves to repair the Fox Point boat launch. Old business involved the redirection of community service grant funds and consideration of the first amendment to a development agreement between the city and William Street Investment Partners LLC.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of De Pere's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database