Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Accepting 1st-tier pre-engineered canopy subcontractor prequalification submittals for the es bus & entry canopies. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seeking to pre-qualify contractors for subcontractor trade packages. The Varina Public Services Center project consists of new buildings along with an addition and partial renovation of their existing Administration building. This project includes a 15 acre site that will require partial demolition of existing hardscapes and underground utilities, a full earthwork package, new utility and storm infrastructure, rework of existing detention ponds and new pond construction, and new asphalt and concrete paving. The site will be landscaped on all sides due to setback requirements. The project will be phased so certain aspects of the sitework package and new building construction will need to be coordinated for timing and logistics to keep the facility operating. The new buildings are primarily PEMB structures with a mix of masonry, metal panel cladding, and light gage framing. The largest of the new structures, the Out-Building, will include a full interior admin area complete with interior infrastructure and finishes. The remainder of the new PEMB structures will be a mix of covered parking structures, enclosed storage, and a Decant shed for liquids storage. The addition to the existing Admin building will be structural steel framing with load bearing CMU and exterior framing. There will be a new stranding seam metal roof to match the existing structure and a low TPO roof. This addition will be completely upfit on the interior.
Posted Date
Oct 22, 2025
Due Date
Jan 23, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Oct 22, 2025
Close: Jan 23, 2026
Seeking to pre-qualify contractors for subcontractor trade packages. The Varina Public Services Center project consists of new buildings along with an addition and partial renovation of their existing Administration building. This project includes a 15 acre site that will require partial demolition of existing hardscapes and underground utilities, a full earthwork package, new utility and storm infrastructure, rework of existing detention ponds and new pond construction, and new asphalt and concrete paving. The site will be landscaped on all sides due to setback requirements. The project will be phased so certain aspects of the sitework package and new building construction will need to be coordinated for timing and logistics to keep the facility operating. The new buildings are primarily PEMB structures with a mix of masonry, metal panel cladding, and light gage framing. The largest of the new structures, the Out-Building, will include a full interior admin area complete with interior infrastructure and finishes. The remainder of the new PEMB structures will be a mix of covered parking structures, enclosed storage, and a Decant shed for liquids storage. The addition to the existing Admin building will be structural steel framing with load bearing CMU and exterior framing. There will be a new stranding seam metal roof to match the existing structure and a low TPO roof. This addition will be completely upfit on the interior.
AvailablePrequalification pool for citywide demolition services.
Posted Date
Oct 17, 2024
Due Date
Jun 25, 2026
Release: Oct 17, 2024
Close: Jun 25, 2026
Prequalification pool for citywide demolition services.
AvailablePomona Unified School District is soliciting contractor prequalification applications for district construction projects; applications are submitted via the PQBids portal. Prequalification is required for bidding on applicable district projects and is valid for a defined period (generally one year).
Posted Date
Oct 9, 2025
Due Date
Oct 9, 2026
Release: Oct 9, 2025
Close: Oct 9, 2026
Pomona Unified School District is soliciting contractor prequalification applications for district construction projects; applications are submitted via the PQBids portal. Prequalification is required for bidding on applicable district projects and is valid for a defined period (generally one year).
AvailableProvide prequalification pool that will be used to solicit various cultural programming and event producer services on an “as needed” basis.
Posted Date
Dec 16, 2022
Due Date
Sep 14, 2027
Release: Dec 16, 2022
Close: Sep 14, 2027
Provide prequalification pool that will be used to solicit various cultural programming and event producer services on an “as needed” basis.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →