Mountain Top Public Water Authority
Special DistrictAR
Aug 3, 2026
Closes
Sep 9, 2026
Mountain Top PWA Meter Replacement RFP
The Work may include, but is not necessarily limited to, the following: 1. the installation of water meters (varying sizes) with integral endpoints. 2. the installation of water meter lids and boxes. 3. GPS location of water meters. 4. Ancillary items required for a complete, functioning, meter assembly.