Freedom PWA Meter Replacement RFP
Aug 3, 2026
Closes
Sep 10, 2026
The Work may include, but is not necessarily limited to, the following: 1. the installation of water meters (varying sizes) with integral endpoints. 2. the installation of water meter lids and boxes. 3. GPS location of water meters. 4. Ancillary items required for a complete, functioning, meter assembly.