Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Marlborough seeks contractors for dam maintenance, including tree and stump removal, vegetation clearing, and construction of a rip rap channel to restore flow and prevent erosion. Estimated project cost is $200,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project generally consists of restoring the functionality of the Diversion Dam by repairing and reinforcing its structure to ensure stability. Additionally, a notch will be added to the dam to facilitate fish passage. The project also includes placing riprap and rocks downstream of the dam, as well as bank revegetation efforts.
Posted Date
Jan 12, 2026
Due Date
Feb 2, 2026
Release: Jan 12, 2026
Close: Feb 2, 2026
Project generally consists of restoring the functionality of the Diversion Dam by repairing and reinforcing its structure to ensure stability. Additionally, a notch will be added to the dam to facilitate fish passage. The project also includes placing riprap and rocks downstream of the dam, as well as bank revegetation efforts.
AvailableProvide engineering analyses and design services to perform decommissioning design for the flagler dam project.
Posted Date
Dec 11, 2025
Due Date
Jan 28, 2026
Release: Dec 11, 2025
Close: Jan 28, 2026
Provide engineering analyses and design services to perform decommissioning design for the flagler dam project.
AvailableProject consists of removing and replacing the existing pipe through the dam and the headgate structure on the north side of the dam. The project will consist of minor structural concrete and grouting for the concrete collars to hold the proposed pipe in place. The existing concrete structures will remain.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
Project consists of removing and replacing the existing pipe through the dam and the headgate structure on the north side of the dam. The project will consist of minor structural concrete and grouting for the concrete collars to hold the proposed pipe in place. The existing concrete structures will remain.
AvailableRequires comprehensive generator and automatic transfer switch (ATS) maintenance and repair services for Dam facilities.
Posted Date
Jan 23, 2026
Due Date
Feb 23, 2026
Release: Jan 23, 2026
Close: Feb 23, 2026
Requires comprehensive generator and automatic transfer switch (ATS) maintenance and repair services for Dam facilities.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →