Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Army Engineer District Tulsa
Alstom Excitation System Maintenance Service. Performing inspection, diagnostics, and corrective maintenance on a quantity of two excitation systems designated U1 at the Keystone Dam hydroelectric power plant and U2 at the Webbers Falls Dam hydroelectric power plant. The contractor shall correct known excitation system problems and report problems revealed through diagnostics with proposed corrective maintenance to the government.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Army Engineer District Tulsa
This project includes the replacement of the excitation systems (including the Potential Transformers) for all units at Powerhouse. The installation and commissioning of Unit 1 will be dependent on the availability of the unit, which is currently out of service due to issues with the speed gear. The Contractor will be responsible for designing and manufacturing the new excitation system equipment, delivering to the site, removing the existing equipment, installing the new equipment, and commissioning the new system. They will also perform model validation testing and reporting as listed above. The Hydroelectric Design Center (HDC) will provide submittal reviews, factory visit(s) to witness factory testing, and commissioning support to include determining draft settings for the excitation systems. The government will be responsible for landing all new cable (except for the AC cables from the bus tap to the Potential Transformers and the DC cables from the exciter to the brush rigging) to all external locations within the powerhouse, external to the new exciter and Potential Transformer cubicles.
Posted Date
Oct 29, 2025
Due Date
Mar 10, 2026
Release: Oct 29, 2025
U.S. Army Engineer District Tulsa
Close: Mar 10, 2026
This project includes the replacement of the excitation systems (including the Potential Transformers) for all units at Powerhouse. The installation and commissioning of Unit 1 will be dependent on the availability of the unit, which is currently out of service due to issues with the speed gear. The Contractor will be responsible for designing and manufacturing the new excitation system equipment, delivering to the site, removing the existing equipment, installing the new equipment, and commissioning the new system. They will also perform model validation testing and reporting as listed above. The Hydroelectric Design Center (HDC) will provide submittal reviews, factory visit(s) to witness factory testing, and commissioning support to include determining draft settings for the excitation systems. The government will be responsible for landing all new cable (except for the AC cables from the bus tap to the Potential Transformers and the DC cables from the exciter to the brush rigging) to all external locations within the powerhouse, external to the new exciter and Potential Transformer cubicles.
AvailablePacific NW Region PN 6615
Provide Hungry Horse Excitation System Replacement. Construction contract to design, furnish, install, test and commission replacement of existing excitation systems with fully static digital excitation systems for Generator Units 1, 2, 3, and 4 in the Powerplant.
Posted Date
Nov 12, 2024
Due Date
Dec 16, 2025
Release: Nov 12, 2024
Pacific NW Region PN 6615
Close: Dec 16, 2025
Provide Hungry Horse Excitation System Replacement. Construction contract to design, furnish, install, test and commission replacement of existing excitation systems with fully static digital excitation systems for Generator Units 1, 2, 3, and 4 in the Powerplant.
AvailableLewis County Public Utility District 1
Provide excitation system, associated accessories including engineering delivery, training and commissioning.
Posted Date
Oct 1, 2025
Due Date
Nov 20, 2025
Release: Oct 1, 2025
Lewis County Public Utility District 1
Close: Nov 20, 2025
Provide excitation system, associated accessories including engineering delivery, training and commissioning.
AvailableU.S. Army Engineer District Omaha
Replace the entire line-up in Powerhouse 1 and Powerhouse 2 Powerhouse 1. Replace the Main 125V DC Station Board Panel (including all DC and preferred AC). Replace the Preferred AC Panel (located in the same location as the DC Station Board). See attached file.
Posted Date
-
Due Date
Dec 1, 2025
U.S. Army Engineer District Omaha
Close: Dec 1, 2025
Replace the entire line-up in Powerhouse 1 and Powerhouse 2 Powerhouse 1. Replace the Main 125V DC Station Board Panel (including all DC and preferred AC). Replace the Preferred AC Panel (located in the same location as the DC Station Board). See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis