Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Tri-Dam Power Authority
The Tri-Dam Power Authority is seeking qualified high-voltage contractors to replace 24 existing 115kV transmission structures. Detailed specifications for the replacement work are provided in the Invitation to Bid. A mandatory pre-bid job walk is scheduled for June 24, 2026.
Posted Date
Jun 10, 2026
Due Date
Jul 15, 2026
Release: Jun 10, 2026
Tri-Dam Power Authority
Close: Jul 15, 2026
The Tri-Dam Power Authority is seeking qualified high-voltage contractors to replace 24 existing 115kV transmission structures. Detailed specifications for the replacement work are provided in the Invitation to Bid. A mandatory pre-bid job walk is scheduled for June 24, 2026.
AvailableTri-Dam Power Authority
Tri-Dam Project is soliciting proposals for a turnkey replacement of its Supervisory Control and Data Acquisition (SCADA) system, including system design, supply, installation, integration with existing infrastructure, testing, commissioning, and training. Vendors must submit questions by March 30, 2026 at 3:00 PM Pacific (per the solicitation instructions) and proposals are due April 9, 2026 at 3:00 PM Pacific, followed by a public bid opening. The solicitation is issued by Tri-Dam Project (a public joint powers entity) and is a procurement (not a grant).
Posted Date
Mar 5, 2026
Due Date
Apr 9, 2026
Release: Mar 5, 2026
Tri-Dam Power Authority
Close: Apr 9, 2026
Tri-Dam Project is soliciting proposals for a turnkey replacement of its Supervisory Control and Data Acquisition (SCADA) system, including system design, supply, installation, integration with existing infrastructure, testing, commissioning, and training. Vendors must submit questions by March 30, 2026 at 3:00 PM Pacific (per the solicitation instructions) and proposals are due April 9, 2026 at 3:00 PM Pacific, followed by a public bid opening. The solicitation is issued by Tri-Dam Project (a public joint powers entity) and is a procurement (not a grant).
Tri-Dam Power Authority
The Tri-Dam Project seeks a qualified solar contractor to plan and install a solar panel array with a propane Generac-brand generator backup to replace the existing power system at Donnells Dam. Work includes decommissioning existing equipment, installation and commissioning of electrical and propane plumbing systems, and delivery of drawings and documentation; the project is expected to begin Jan–Feb 2026 (weather-permitting).
Posted Date
Oct 28, 2025
Due Date
Dec 2, 2025
Release: Oct 28, 2025
Tri-Dam Power Authority
Close: Dec 2, 2025
The Tri-Dam Project seeks a qualified solar contractor to plan and install a solar panel array with a propane Generac-brand generator backup to replace the existing power system at Donnells Dam. Work includes decommissioning existing equipment, installation and commissioning of electrical and propane plumbing systems, and delivery of drawings and documentation; the project is expected to begin Jan–Feb 2026 (weather-permitting).
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Tri-Dam Power Authority
The agenda includes the review and approval of financial statements, the treasurer's report, and the statement of obligations. Action items feature the approval of a non-represented employee cost-of-living adjustment, a presentation on a power purchase agreement, the renewal of the workers' compensation insurance policy, and the renewal of the chief dam safety engineer contract. Additionally, the meeting covers staff reports on general operations, maintenance, compliance, and tunnel updates, alongside generation and fisheries reports. A closed session is scheduled to address existing litigation, anticipated litigation, a claim for money damages, and negotiations concerning real property.
The board meeting agenda included recognizing and awarding employees for years of service, implementing an Owner's Dam Safety Program (ODSP) to meet FERC requirements, approving a SCADA replacement project bid by Siemens, reviewing the Beardsley Reservoir Boat Launch Policy, and authorizing contract increases for shoreline management and FERC regulatory support. Additionally, the board considered the Tulloch Concessionaire Agreement, capital expenses for office furniture, and conducted executive sessions regarding litigation and real property negotiations.
The board addressed various operational and administrative items, including the approval of treasurer's reports and statements of obligations. Key discussion topics included the extension of Islanding Agreements with PG&E and Silicon Valley Power, the authorization for roof replacement at the Strawberry Office, the replacement of an HVAC unit at the Donnells Powerhouse, and the approval of a legal services contract with CalNeva Water Services. Additionally, staff reports were provided regarding general operations, maintenance, compliance, and specific infrastructure projects like the Canyon Tunnel update.
The agenda includes several action items such as the renewal of casualty insurance, approval of a compliance support job description, a FERC security assessment, a scope of work proposal for the Donnells Exciter, and the bid for the Donnells Solar Project. The board will review staff reports, updates on the Canyon Tunnel Project, and generation and fisheries studies. Additionally, the meeting will include a closed session to discuss existing and anticipated litigation, negotiations regarding real property, and public employment for the role of legal counsel.
The board meeting addressed several key business items, including the approval of the treasurer's reports for January and February 2026, the February 2026 Statement of Obligations, and a resolution designating bank account signatories. Action items included the approval of the 2026-2027 casualty insurance renewal, the creation of a new Compliance Technician I/II position, consideration of an HDR Inc. proposal for a FERC security assessment, approval of the GFT Scope of Work proposal for the Donnells Exciter, and acceptance of the bid for the Donnells Solar Project. Communications included staff reports, a generation report, updates on fisheries studies, and various directors' comments. The board also convened for a closed session to discuss existing and anticipated litigation, real property negotiations, and public employment.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Tri-Dam Power Authority's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge