CityTX
Posted
Sep 1, 2026
Oct 13, 2026
Forest Vista AC Water Line Decommissioning
Work includes 1 LS site preparation; 1 LS erosion and sediment control; 2 EA project sign; 320 SY topsoil (4" depth); 320 SY block sod (match existing type); 2 EA 2-inch gate valve; 3 EA 1-inch water meter; 4 EA domestic water meter box; 1 EA 1-inch standard private water service; 2 EA 2-inch standard public water service (long side); 1 EA remove, salvage, & deliver 6" valve; 2 EA cut and plug existing water main.