Alabama Department of Transportation
Special DistrictAL
Posted
Aug 29, 2026
Sep 25, 2026
Resurfacing and Traffic Stripe on CR-24 RFP
Work includes 64,044 SY bituminous treatment g (with polymer additive), 3,522 gal tack coat, superpave bituminous concrete wearing surface layer, 1/2" maximum aggregate size mix, esal range a/b 5,534 ton, superpave bituminous concrete upper binder layer, patching, 1" maximum aggregate size mix, esal range a/b 395 ton, superpave bituminous concrete upper binder layer, leveling, 1/2" maximum aggregate size mix, esal range a/b 255 ton, 1,230 ton aggregate surfacing (1" down, crusher run), mobilization, construction fuel, 11 mile solid white, class 2, type a traffic stripe, 7 mile solid yellow, class 2, type a traffic stripe, 4 mile broken yellow, class 2, type a traffic stripe, 7 mile broken temporary traffic stripe. See attached bid ad.